top of page

Two-Day GAF Roof Replacement in Spokane Valley

Writer: Ethan Rhoades
Ethan Rhoades
Nov 8
1 min read

Updated: Nov 8

Spokane Valley, WA · GAF Timberline HDZ · April 2026

Some roofs don't have a crazy story. They just need to be done right. This single-story Spokane Valley home took two days. The crew stripped it to the deck, put on new drip edge, ran ice and water up from the eaves and through the valleys, and covered the rest in GAF FeltBuster with cap nails. GAF Timberline HDZ went on with a six-nail pattern and new ridge cap. Our project manager walked it at the end, and the yard got a magnet sweep.

Crew member on the dried-in roof with GAF bundles loaded
Crew member on the dried-in roof with GAF bundles loaded
New GAF Timberline HDZ roof with ridge cap finished
New GAF Timberline HDZ roof with ridge cap finished
Finished front slope facing the street
Finished front slope facing the street
Clean shingle lines on the back slope
Clean shingle lines on the back slope

Most homes take us a day or two. Give us a call for a free inspection.


Comments


bottom of page