Case study · Downtown Spokane, WA · GAF Timberline shingles · August 2026

The problem

Our inspection turned up problems all over this downtown church's aging roof. Going over the old roof would have saved money up front, but it could cause trouble down the road. We recommended a full tear-off and a new roof system.

What we did

We set up fall protection and protected the grounds, walkways and landscaping. Then we tore the roof off down to the deck and checked every board.

New drip edge went around the whole roof. Ice and water shield went into every valley, around every penetration and up from the eaves, with synthetic underlayment over the rest. We installed GAF Timberline shingles using a six-nail pattern, replaced every flashing, brought the ventilation up to code and manufacturer specs, and capped the ridge with matching shingles.

The roof was sealed up every night, the grounds were swept with a magnet every day, and the job was permitted and inspected.

Before: the original church roof
Before: the original church roof
During: roof dried in
During: roof dried in
During: underlayment down and ready for shingles
During: underlayment down and ready for shingles
After: finished GAF roof
After: finished GAF roof

The result

Tear-off to finish took about four days. The church now has a new GAF roof with all new flashings and proper ventilation, installed by a GAF Master Elite contractor.