top of page

Westminster Apartments: Saving a Flat Roof From Tenant Damage

Writer: Ethan Rhoades
Ethan Rhoades
Nov 10
1 min read

Commercial case study · Browne's Addition, Spokane, WA · Silicone roof coating · June 2026

The problem

The flat roof on this historic Browne's Addition apartment building was covered in cigarette burns and damage from tenants walking on it. Several spots were close to leaking.

What we did

We saved the roof instead of tearing it off. We pressure washed it and marked every burn and damaged spot. Then we primed it, reinforced each repair with three courses of fabric and coated the whole roof with silicone.

After: finished silicone roof along the brick wall
After: finished silicone roof along the brick wall
After: walls and edges sealed and coated
After: walls and edges sealed and coated
After: pipe flashing sealed and coated
After: pipe flashing sealed and coated

The result

The job took two days in June 2026. The roof is backed by a 20-year NDL manufacturer warranty plus our 10-year workmanship warranty.

Manage an apartment building? We'll inspect the roof for free and show you what we find.


Comments


bottom of page