Spokane Valley Condos: Three Roofs, One Building at a Time
Case study · Spokane Valley, WA · Owens Corning Duration shingles · 2024 to 2026
The problem
A condo community in Spokane Valley had three buildings with roofs at the end of their lifespan. People live there, so tearing everything off at once wasn't an option.
What we did
We did one building at a time. We tore each roof off down to the deck and checked the wood. Then came new drip edge, ice and water shield at the eaves and valleys, synthetic underlayment, valley metal and starter strip. Owens Corning Duration shingles went on with new ridge cap, wall flashings, vents and pipe boots. The grounds were swept with a magnet every day.





The result
Three new roofs between 2024 and 2026, and residents stayed in their homes the whole time.
Manage an HOA or condo community? We'll walk every roof and give you a plan. Free inspection.
Book your free roof inspection or call us today.





Comments