top of page

Spokane Valley Condos: Three Roofs, One Building at a Time

Writer: Ethan Rhoades
Ethan Rhoades
Nov 10
1 min read

Case study · Spokane Valley, WA · Owens Corning Duration shingles · 2024 to 2026

The problem

A condo community in Spokane Valley had three buildings with roofs at the end of their lifespan. People live there, so tearing everything off at once wasn't an option.

What we did

We did one building at a time. We tore each roof off down to the deck and checked the wood. Then came new drip edge, ice and water shield at the eaves and valleys, synthetic underlayment, valley metal and starter strip. Owens Corning Duration shingles went on with new ridge cap, wall flashings, vents and pipe boots. The grounds were swept with a magnet every day.

Before: the old roof
Before: the old roof
During: tear-off down to the deck
During: tear-off down to the deck
During: underlayment going down
During: underlayment going down
After: new Owens Corning Duration roof
After: new Owens Corning Duration roof
After: finished roofs across the community
After: finished roofs across the community

The result

Three new roofs between 2024 and 2026, and residents stayed in their homes the whole time.

Manage an HOA or condo community? We'll walk every roof and give you a plan. Free inspection.


Comments


bottom of page