PJ's Pub: From Years of Patches to One Solid Roof

Writer: Ethan Rhoades
Ethan Rhoades
Nov 10
1 min read

Commercial case study · North Monroe, Spokane · Acrylic roof coating · 2023

The problem

The pub's low-slope roof was leaking in several spots. It had been patched again and again, the sealant was failing, the membrane was damaged and the flashings weren't done right. And the pub needed it fixed without closing its doors.

What we did

In December 2022 we stopped the active leaks so the pub could get through winter. In July 2023, once the weather warmed up, we coated the whole roof. We hauled off the debris, pressure washed and etched the surface, then masked and primed it. Every penetration and damaged spot got three courses of fabric and acrylic. Then we coated the full roof, rolling it on so it bonds tight.

Before: the worn, patched roof
Before: the worn, patched roof
During: roof primed and repairs underway
During: roof primed and repairs underway
During: coating going on
During: coating going on
After: finished white coated roof
After: finished white coated roof
After: finished roof on North Monroe
After: finished roof on North Monroe

The result

One clean, white, watertight roof in place of years of patches. PJ's then joined our twice-a-year roof and gutter maintenance plan, so small problems get caught early.

Running a business under a leaky roof? We'll inspect it for free.