top of page

Red Dragon Downtown: Told to Tear It Off, We Coated It Instead

Writer: Ethan Rhoades
Ethan Rhoades
Nov 10
1 min read

Commercial case study · Downtown Spokane, WA · TPO roof coating · 2023

The problem

The downtown Red Dragon building on West 3rd Ave had an old TPO roof with leaks, bad past repairs, failing sealant and damaged membrane. Several roofers told the owner it couldn't be coated and the only fix was a full tear-off.

What we did

We inspected it ourselves and saw it could be saved. We pressure washed the roof and marked every problem. Then we primed it, reinforced each repair with three courses of fabric and coated the whole roof.

During: old TPO roof cleaned and prepped
During: old TPO roof cleaned and prepped
During: repairs and fabric going in
During: repairs and fabric going in
During: coating going on
During: coating going on
After: finished coated roof
After: finished coated roof

The result

We coated it in 2023 and it hasn't leaked since. It's backed by a 20-year NDL manufacturer warranty plus our 10-year workmanship warranty, for a fraction of what a tear-off would have cost.

Told your flat roof has to be torn off? Get a second opinion. Free inspection.


Comments


bottom of page