top of page
Finished white TPO commercial reroof

Commercial Roof Replacement
Done Patching? Get a Roof Built for Your Building.

★★★★★  5.0  on Google  ·  413 Reviews

CERTIFIED

GAF  â€¢  VERSICO  â€¢  GENFLEX  â€¢  BBB A+ RATED  â€¢  LICENSED, BONDED & INSURED

A New Roof, Planned Around Your Property.
When it’s time for a new roof, we help you choose the right system for your building, budget and long-term plans.

​

You receive a clear explanation of the materials, recommended work, warranty options and what to expect throughout the project.

​

We start with a free inspection, photos, video and a complete breakdown of your roof’s condition. If repairs or restoration remain a practical option, we’ll explain those too.

The Right Roofing System for Your Building

TPO, PVC, EPDM, metal and shingles for applicable roof areas. We help you compare options based on roof slope, drainage, rooftop equipment, building use and your priorities. Your proposal explains the recommended system and why it fits your property. 20-year NDL (No Dollar Limit) warranties are available on qualifying coating and TPO systems.

Finished white membrane on a commercial low-slope roof

What's Included

 We Handle the Details

• Required permits and inspections

• Removal and disposal, or preparation for an approved recover

• Necessary deck repairs and surface preparation

• Insulation and drainage improvements included in the project

• Roofing, flashing, roof openings and edge details

• Coordination around rooftop equipment and building access

• Property protection and cleanup throughout the work

• Before, during and after photos

• Applicable manufacturer warranty registration

​

You know what’s included, who your project contact is and how the work will be scheduled.

How It Works

Understand the condition. Choose the system. Know what to expect.

1. Inspect and Document

We assess your roofing system, drainage and accessible underlying areas. We document our findings and explain any additional testing or evaluation needed to plan the replacement.

2. Compare and Plan

You receive roofing options and a detailed written proposal covering materials, scope and warranty choices. Your project manager reviews scheduling, crew access, tenant needs and how we’ll protect your property throughout the work.

3. Install and Document

We install the approved system to manufacturer specifications and applicable building requirements.

​

We plan each stage to protect the building from weather, keep the site orderly and complete the required inspections. You receive finished-work documentation, warranty information and care recommendations.

From offices and retail buildings to warehouses, storage facilities and multifamily properties, we coordinate with your team to keep the project organized.

Don’t Just Take Our Word for It. Hear From Our Customers.

★★★★★

Fantastic roofer to work with. We had several bidders come out to inspect our business's flat roof. Their inspector spent nearly an hour on the roof marking all of the deficiencies, while the other companies only spent 10 to 15 minutes before quickly trying to sell us a new roof.

Ted D. on Google

Questions About Commercial Roof Replacement

How Do We Know It’s Time to Replace the Roof?

We evaluate its overall condition, recurring issues and whether continued repairs or restoration make sense. You receive documented findings and the reasons behind our recommendation before making a decision.

​

Which Roofing System Is Best for Our Building?

The right choice depends on your roof’s design, building use, drainage and budget. We explain suitable options, their maintenance needs and available warranties so you can compare them clearly.

Does the Existing Roof Have to Be Removed?

Not always. Some buildings qualify for a new system over the existing roof. We assess the existing materials, condition, roof layers and applicable requirements, then explain whether a recover or tear-off is appropriate.

​

How Long Will the Project Take?

The schedule depends on roof size, the selected system, preparation and weather. Your project manager explains the expected timeline before work begins and keeps you informed if conditions affect the schedule.

Can You Work Around Our Tenants or Business Hours?

Yes. We coordinate access, deliveries and work areas with your team. We explain expected noise and disruption so you can prepare occupants and plan around the work.

​

Do You Handle Permits and Warranties?

Yes. We handle required permits, coordinate inspections and complete applicable manufacturer warranty registration.

​

We explain manufacturer and workmanship coverage, including the terms and maintenance requirements that apply to your project.

Ready When You Are!

Prefer email? office@firstrateroofingservices.com

WA L&I Reg. #FIRSTRR771CG • ID Contractor Reg. #5581907

bottom of page